1. Before installation of grass-roots surface dust, dirt, alkali film and other things should be carefully cleaned up.
2. Colour steel plate partition wall decorative installation process according to the ‘first under the principle of’, in order to reduce the repair, protection of finished products.
3. Seal the same colour sealant at the joints of the board wall.
4. Surface cleaning after installation of Wall Panel.
1. The Sandwich Wall Panel installation should be vertical, and the top plate installation should be horizontal.
2. The process seam should be even and the sealant should be full.
3. There shall be no scratches on the surface of the board wall.
1. Familiar with the Clean Room drawings, carefully review the colour of the colour steel plate, filler, basic size requirements, colour steel plate plane layout, node requirements, in the colour steel plate partition in the door, window size and arrangement.
2. The second row plate charting, this is colour steel plate prefabrication and installation of an important step, is the design drawings into available in the factory for the second time processing, the standard specification plate made of different types of wall plate, for the combination.
3. In the Clean Room factory prefabrication, according to experience, door holes, window holes and seams to fully take into account the gap and installation margin. And in the whole transport production, installation process, prevent scratch, heavy pressure and surface impact, in order to prevent the appearance of uncorrectable pits and scratches.
4. Clean Room colour steel plate installation before the release line work, should be in the ground (floor) surface after the completion of the installation, and have other related conditions such as the installation of larger equipment has been transported to the position, dark laying ground pipeline has been adjusted to complete and technology mezzanine main installation work basically completed, can be carried out.
5. Install the upper and lower manger, the lower manger is generally used with internal and external R corner of the aluminium alloy profile. Fixed with nails on the ground drawn on the line, the location of nails to straight line 1.2-1.5m spacing, corners and terminals from the edge of the 0.2m is appropriate, the use of water-stopping rubber strips in the shooting nails before the two rubber strips (Ф2-3) into the slot under the nails fixed to form a waterproof isolation closed. On the manger for the pressed groove aluminium, hard ceiling with a nail gun fixed in the roof, soft ceiling with a boom suspended at the level of the level below, the height of the ceiling to the net height shall prevail.
6. Fine standing wall panels, according to the layout plan into the prefabricated components, components between the fixed inserts to lock the adjacent wall panels.
7. Installation of Cleanroom ceiling plate: The weight of the ceiling plate is supported by the perimeter of the vertical plate fixed and suspended in the middle of the T-aluminium. The long side seams are secured and reinforced by fixing inserts between the seams, and the short side is secured by T-aluminium and connecting plate blind rivets.
8. Colour steel plate wraps the column, wraps the box, installs the yin and yang R angle The column in the purification area uses the б=50 colour steel plate to wrap up in favour of saving the material and unifying the yin and yang R angle are 50.
9. In the purification area, all the following gaps which may affect the cleanliness should be coated with sealing silica gel.